Template · Solar and storage

Battery and PV with whole-home gateway single line diagram

Service-rated gateway ahead of the main panel. Use this for solar and a battery behind a service-rated gateway installed ahead of the main panel, so the whole home is backed up.

A free template with typical ratings, conductor callouts and general notes. Open it, change what differs on your job, fill in the title block and export a PDF.

Open this template in the editor Download the SVG

Battery and PV with whole-home gateway single line diagram: service-rated gateway ahead of the main panel.
Battery and PV with whole-home gateway. 9 devices on an 11 × 17 in sheet with a title block and notes column.

What the reviewer checks on this drawing

The reviewer checks that the gateway is now the service disconnect, with the main bonding jumper moved to it and the main panel neutrals isolated, along with the busbar arithmetic and the rapid shutdown initiation device.

What the drawing shows

Every device on the sheet, in the order power reaches it.

SymbolLabelRating or detailConductors feeding it
Utility sourceUtility service120/240V 1φ 3W
MeterUtility meter200A socketService conductors, per utility
DeviceBackup gateway (GATEWAY)200A · service rated, main breaker inside
PanelMain panel225A bus · neutrals isolated3 #3/0 Cu + #6 G
Circuit breakerExistingAll house loads
LoadExisting loads
Circuit breaker60A 2PESS
InverterHybrid inverter and battery11.5 kW · 13.5 kWh
PV arrayPV arrayDC-coupled · 12 kW DCPV wire #10 Cu

Notes on the sheet

  • Gateway is the service disconnect. Main bonding jumper relocated to the gateway; main panel neutrals isolated.
  • Busbar check: 225A bus × 120% = 270A ≥ 200A + 60A. Backfed breaker at the opposite end of the bus from the supply.
  • Rapid shutdown initiation device located at the gateway and labelled.

Diagram is schematic and not to scale. Field-verify existing equipment ratings. Ratings and conductor sizes shown are typical. Confirm against the adopted code, the equipment listing and a load calculation before installation. Code references are to the 2023 NEC and the 2024 Canadian Electrical Code: see references and editions.

See all solar and battery single line diagrams, or all 40 templates.

Start from this drawing

Free, in the browser, no account. Start from a template or describe the job in plain words, edit the drawing and export a PDF.