Template · Generators

Standby generator, whole-home ATS single line diagram

Service-rated 200A automatic transfer switch. Use this for a permanently installed standby generator that backs up the whole house through a service-rated 200A automatic transfer switch.

A free template with typical ratings, conductor callouts and general notes. Open it, change what differs on your job, fill in the title block and export a PDF.

Open this template in the editor Download the SVG

Standby generator, whole-home ATS single line diagram: service-rated 200A automatic transfer switch.
Standby generator, whole-home ATS. 8 devices on an 11 × 17 in sheet with a title block and notes column.

What the reviewer checks on this drawing

The reviewer checks the transfer switch as the new service disconnect, with the grounding electrode conductor and main bonding jumper landing there; the old main panel converted to a subpanel; the generator breaker; and load shedding if the calculated load is more than the generator can carry.

What the drawing shows

Every device on the sheet, in the order power reaches it.

SymbolLabelRating or detailConductors feeding it
Utility sourceUtility service120/240V 1φ 3W
MeterUtility meter200A socketService conductors, per utility
Transfer switchAutomatic transfer switch200A · service rated, main disconnect inside
Circuit breaker100A 2PGenerator breaker
GeneratorStandby generator22 kW · 120/240V, natural gas
PanelMain panel200A bus · neutrals isolated3 #3/0 Cu + #6 G
Circuit breakerExistingAll house loads
LoadExisting loads

Notes on the sheet

  • Transfer switch is the service disconnect. Grounding electrode conductor and main bonding jumper terminate at the transfer switch.
  • Existing main panel becomes a subpanel: isolate neutrals and remove the bonding screw.
  • Generator 22 kW ÷ 240V = 92A, protected at 100A.
  • Load shedding modules added if the calculated load exceeds the generator rating.

Diagram is schematic and not to scale. Field-verify existing equipment ratings. Ratings and conductor sizes shown are typical. Confirm against the adopted code, the equipment listing and a load calculation before installation. Code references are to the 2023 NEC and the 2024 Canadian Electrical Code: see references and editions.