Standby generator, essential loads panel single line diagram

100A transfer switch feeding an essential loads subpanel. Use this when a smaller standby generator backs up only the essential circuits. A 100A transfer switch feeds an essential loads subpanel, and the main panel stays on utility power.

A free template with typical ratings, conductor callouts and general notes. Open it, change what differs on your job, fill in the title block and export a PDF.

Open this template in the editor Download the SVG

Standby generator, essential loads panel single line diagram: 100A transfer switch feeding an essential loads subpanel.
Standby generator, essential loads panel. 13 devices on an 11 × 17 in sheet with a title block and notes column.

What the reviewer checks on this drawing

The reviewer checks the generator output and its breaker, the isolated neutrals in the essential loads panel, and the generator’s placement and clearances.

What the drawing shows

Every device on the sheet, in the order power reaches it.

SymbolLabelRating or detailConductors feeding it
Utility sourceUtility service120/240V 1φ 3W
MeterUtility meter200A socketService conductors, per utility
Circuit breaker200A 2PMain breaker
PanelMain panel200A bus · 120/240V
Circuit breakerExistingNon-essential loads
LoadExisting loads
Circuit breaker100A 2PATS feed
Transfer switchAutomatic transfer switch100A · not service rated3 #3 Cu + #8 G
Circuit breaker60A 2PGenerator breaker
GeneratorStandby generator14 kW · 120/240V
PanelEssential loads panel100A MLO · 120/240V
Circuit breakerBranchEssential circuits
LoadFurnace, sump, fridge, lighting

Notes on the sheet

  • Generator 14 kW ÷ 240V = 58A, protected at 60A.
  • Essential loads panel neutrals isolated from the enclosure.
  • Generator placement and clearances per manufacturer instructions and the gas code.

Diagram is schematic and not to scale. Field-verify existing equipment ratings. Ratings and conductor sizes shown are typical. Confirm against the adopted code, the equipment listing and a load calculation before installation. Code references are to the 2023 NEC and the 2024 Canadian Electrical Code: see references and editions.

See all generator single line diagrams, or all 40 templates.