House and ADU on a two-meter 400A service single line diagram
A two-position meter socket with a 200A main for the house and a 100A main for a detached ADU. Use this when a detached accessory dwelling unit (ADU) gets its own meter. The service to the lot is replaced with a 400A two-position meter socket, with a main for the house and a main for the ADU.
A free template with typical ratings, conductor callouts and general notes. Open it, change what differs on your job, fill in the title block and export a PDF.
Open this template in the editor Download the SVG
What the reviewer checks on this drawing
The reviewer checks the two service disconnects grouped and labelled, the load calculation for each dwelling, the ADU feeder with its building disconnect and grounding electrode, surge protection for each dwelling, and the utility’s approval of the meter equipment.
What the drawing shows
Every device on the sheet, in the order power reaches it.
| Symbol | Label | Rating or detail | Conductors feeding it |
|---|---|---|---|
| Utility source | Utility service | 120/240V 1φ 3W | |
| Device | Two-position meter socket (2-METER) | 400A · main breaker, for each position | Service conductors, per utility |
| Ground | Grounding electrode system | GEC per NEC Table 250.66 | |
| Meter | House meter | ||
| Circuit breaker | 200A 2P | House main | |
| Panel | House panel | 200A bus · neutrals isolated | 3 #3/0 Cu + #6 G |
| Circuit breaker | Branch breakers | ||
| To (continues off sheet) | To house circuits | ||
| Surge protective device | SPD | Type 1 or 2 | |
| Meter | ADU meter | ||
| Circuit breaker | 100A 2P | ADU main | |
| Circuit breaker | 100A 2P | Building disconnect | 3 #3 Cu + #8 G, PVC underground |
| Panel | ADU panel | 100A bus · neutrals isolated | |
| Grounding electrode | Ground rods | At the ADU, #6 Cu GEC | |
| Surge protective device | SPD | Type 1 or 2 | |
| Circuit breaker | 40A 2P | GFCI | |
| Load | Range | 3 #8 Cu + #10 G | |
| Circuit breaker | 30A 2P | GFCI | |
| Disconnect switch | Disconnect | 30A · NEMA 3R, within sight of unit | 2 #10 Cu + #10 G |
| Load | Heat pump | ||
| Circuit breaker | 30A 2P | ||
| Load | Water heater | 2 #10 Cu + #10 G | |
| Circuit breaker | Branch breakers | ||
| To (continues off sheet) | To ADU circuits |
Notes on the sheet
- The service to the house is replaced with a 400A two-position meter socket. The house panel stays and becomes a subpanel: four-wire feeder, neutrals isolated, bonding screw removed.
- Each main is a service disconnect. The two are grouped at the meter socket, outdoors (NEC 230.72). Each is marked with the dwelling it serves and EMERGENCY DISCONNECT, SERVICE DISCONNECT (NEC 230.85, 2020 and later).
- ADU feeder: four-wire, neutral isolated at the ADU, with a grounding electrode at the ADU connected to its equipment grounding bar (NEC 250.32). The main breaker in the ADU panel is the building disconnect (NEC 225.31). The 2023 NEC also asks for an emergency disconnect outdoors at a dwelling supplied by a feeder (225.41): where the ADU panel is indoors, add one on the outside wall, marked EMERGENCY DISCONNECT, NOT SERVICE EQUIPMENT.
- Grounding electrode conductor and main bonding jumper at the meter socket, sized from the service entrance conductors. Surge protective device, Type 1 or Type 2, for each dwelling, here at its panel (NEC 230.67).
- Ground-fault protection on the ADU’s range (NEC 210.8(D), 2023) and on its outdoor heat pump (NEC 210.8(F), 2020 and later; the 2023 edition exempted listed HVAC equipment until September 2026 and local amendments often still do). The CEC asks for neither. Disconnect within sight of the heat pump (NEC 440.14).
- Load calculation for each dwelling (NEC 220.82; CEC Rule 8-200). The service conductors carry the two together.
- Meter socket listed as metering equipment with each main in its own compartment (NEC 230.71(B), 2020 and later). Utility to approve the meter socket and assign the second account. The ADU usually needs its own civic address first.
Diagram is schematic and not to scale. Field-verify existing equipment ratings. Ratings and conductor sizes shown are typical. Confirm against the adopted code, the equipment listing and a load calculation before installation. Code references are to the 2023 NEC and the 2024 Canadian Electrical Code: see references and editions.
Related multi-unit drawings
Duplex with two-gang meter socket
One service drop, two meters, a 100A panel per unit.
Multi-unitView drawingFourplex with meter stack
A 400A four-position meter stack with a main breaker and a feeder for each unit.
Multi-unitView drawingMulti-tenant meter centre
Six tenant meters and a house meter on a 400A bus.
Multi-unitView drawingFour-storey apartment panel replacement
Floor panels replaced on the three-phase risers already in the building.