Template · Multi-unit

Four-storey apartment panel replacement single line diagram

Floor panels replaced on existing three-phase risers. Use this for replacing the floor panels in a four-storey apartment building while keeping the existing three-phase risers.

A free template with typical ratings, conductor callouts and general notes. Open it, change what differs on your job, fill in the title block and export a PDF.

Open this template in the editor Download the SVG

Four-storey apartment panel replacement single line diagram: floor panels replaced on existing three-phase risers.
Four-storey apartment panel replacement. 14 devices on an 11 × 17 in sheet with a title block and notes column.

What the reviewer checks on this drawing

The reviewer looks for which riser conductors are re-used and how they were tested, the order of the work to limit outages, and firestopping of the riser penetrations.

What the drawing shows

Every device on the sheet, in the order power reaches it.

SymbolLabelRating or detailConductors feeding it
Utility sourceUtility service120/208V 3φ 4W
Current transformerCT cabinetUtility metering
Fused disconnectMain switch400A · fused 400A
PanelHouse distribution panel400A · 120/208V 3φ 4W
Circuit breaker100A 3PRiser 4
Panelboard4th floor panelReplaced · 100A4 #3 Cu + #8 G
Circuit breaker100A 3PRiser 3
Panelboard3rd floor panelReplaced · 100A4 #3 Cu + #8 G
Circuit breaker100A 3PRiser 2
Panelboard2nd floor panelReplaced · 100A4 #3 Cu + #8 G
Circuit breaker100A 3PRiser 1
Panelboard1st floor panelReplaced · 100A4 #3 Cu + #8 G
Circuit breaker60A 3PHouse
PanelboardHouse panelCorridors, laundry

Notes on the sheet

  • Existing riser conductors re-used where tested and found serviceable; otherwise replaced as shown.
  • Floor panels replaced one at a time to limit outages. Notify tenants in advance.
  • Firestop all riser penetrations to match the floor assembly rating.

Diagram is schematic and not to scale. Field-verify existing equipment ratings. Ratings and conductor sizes shown are typical. Confirm against the adopted code, the equipment listing and a load calculation before installation. Code references are to the 2023 NEC and the 2024 Canadian Electrical Code: see references and editions.