Template · Generators

Commercial standby generator with ATS single line diagram

Four-pole transfer switch feeding a standby panel at 120/208V. Use this for a commercial building with a three-phase standby generator feeding a standby panel through a four-pole transfer switch.

A free template with typical ratings, conductor callouts and general notes. Open it, change what differs on your job, fill in the title block and export a PDF.

Open this template in the editor Download the SVG

Commercial standby generator with ATS single line diagram: four-pole transfer switch feeding a standby panel at 120/208V.
Commercial standby generator with ATS. 13 devices on an 11 × 17 in sheet with a title block and notes column.

What the reviewer checks on this drawing

The reviewer checks the switched neutral, which makes the generator a separately derived system bonded at the generator; the generator breaker; and a separate transfer switch for any emergency (life-safety) loads.

What the drawing shows

Every device on the sheet, in the order power reaches it.

SymbolLabelRating or detail
Utility sourceUtility service120/208V 3φ 4W
Current transformerCT cabinetUtility metering
Circuit breaker600A 3PMain
PanelMain distribution panel MDP600A · 120/208V 3φ 4W
Circuit breaker400A 3PNormal loads
PanelboardPanel NPNormal power
Circuit breaker225A 3PATS normal feed
Transfer switchAutomatic transfer switch225A · 4-pole
Circuit breaker225A 3PGenerator breaker
GeneratorStandby generator60 kW / 75 kVA, 120/208V · diesel
PanelStandby panel SP225A MLO · 120/208V
Circuit breakerBranchStandby circuits
LoadStandby loads

Notes on the sheet

  • Four-pole transfer switch: generator is a separately derived system, bonded and grounded at the generator.
  • Generator 75 kVA at 208V = 208A, protected at 225A.
  • Emergency (life-safety) loads, where present, require a separate transfer switch and wiring.

Diagram is schematic and not to scale. Field-verify existing equipment ratings. Ratings and conductor sizes shown are typical. Confirm against the adopted code, the equipment listing and a load calculation before installation. Code references are to the 2023 NEC and the 2024 Canadian Electrical Code: see references and editions.

See all generator single line diagrams, or all 40 templates.

Start from this drawing

Free, in the browser, no account. Start from a template or describe the job in plain words, edit the drawing and export a PDF.