Level 2 charger with load management single line diagram
Energy management system sheds the charger when the service is near its limit. Use this when the service is too full for a charger on paper and an upgrade is not wanted. An energy management system (EVEMS) measures the service current and switches the charger off before the main breaker’s limit is reached.
A free template with typical ratings, conductor callouts and general notes. Open it, change what differs on your job, fill in the title block and export a PDF.
Open this template in the editor Download the SVG
What the reviewer checks on this drawing
Show where the current transformers sit (on the service conductors ahead of the main), the setpoint, and the code basis for how the charger is treated in the load calculation.
What the drawing shows
Every device on the sheet, in the order power reaches it.
| Symbol | Label | Rating or detail | Conductors feeding it |
|---|---|---|---|
| Utility source | Utility service | 120/240V 1φ 3W | |
| Meter | Utility meter | 200A socket | Service conductors, per utility |
| Circuit breaker | 200A 2P | Main breaker | |
| Panel | Main panel | 200A bus · 120/240V | |
| Circuit breaker | Existing | Branch breakers | |
| Load | Existing loads | ||
| Circuit breaker | 60A 2P | New | |
| Device | Energy management system (EVEMS) | 60A · CTs on service conductors | |
| EV charger | Level 2 EVSE | 48A · 11.5 kW | 2 #6 Cu THHN + #10 G |
Notes on the sheet
- EVEMS interrupts the EVSE circuit when measured service current exceeds its setpoint (set here to 80% of the main rating).
- Load calculation with a listed energy management system: NEC 220.70 and 750.30 permit its maximum ampere setpoint to be used as the service load, treated as continuous, and 625.42 limits the EVSE load to what the system permits. CEC Rule 8-106 lets the EVSE load be left out where the system monitors the service and controls the EVSE. Confirm the adopted edition.
- Current transformers installed on the service conductors ahead of the main breaker.
Diagram is schematic and not to scale. Field-verify existing equipment ratings. Ratings and conductor sizes shown are typical. Confirm against the adopted code, the equipment listing and a load calculation before installation. Code references are to the 2023 NEC and the 2024 Canadian Electrical Code: see references and editions.
Related EV charger drawings
Level 2 charger from main panel
Dedicated 60A circuit to a hardwired 48A charger.
EVView drawingCharger from subpanel with load management
Garage subpanel feeds the charger through an energy management system.
EVView drawingCondo charger from meter with load miser
Load management device between the unit meter and unit panel feeds the charger.
EVView drawingTwo chargers with power sharing
A 100A EV load centre feeds two chargers that share a group current limit.