Underground feeder, building disconnect and local grounding electrode. Use this for a feeder to a separate building such as a garage, a workshop or an ADU: an underground four-wire feeder, a disconnect at the building and a grounding electrode there.
A free template with typical ratings, conductor callouts and general notes. Open it, change what differs on your job, fill in the title block and export a PDF.
Open this template in the editor Download the SVG
What the reviewer checks on this drawing
The reviewer checks the four-wire feeder with the neutral isolated at the detached building, the local grounding electrode, the building disconnect, and the burial depth for the wiring method.
What the drawing shows
Every device on the sheet, in the order power reaches it.
| Symbol | Label | Rating or detail | Conductors feeding it |
|---|---|---|---|
| Utility source | Utility service | 120/240V 1φ 3W | |
| Meter | Utility meter | 200A socket | Service conductors, per utility |
| Circuit breaker | 200A 2P | Main breaker | |
| Panel | Main panel | 200A bus · 120/240V | |
| Circuit breaker | Existing | Branch breakers | |
| Load | Existing loads | ||
| Circuit breaker | 60A 2P | Feeder | |
| Disconnect switch | Building disconnect | 60A · at detached structure | 3 #6 Cu + #10 G, Sch 40 PVC underground |
| Panel | Garage / ADU panel | 100A MLO · neutrals isolated | |
| Ground | Grounding electrode | At detached structure | |
| Circuit breaker | 20A 1P | ||
| Load | Receptacles | ||
| Circuit breaker | 15A 1P | ||
| Load | Lighting | ||
| Circuit breaker | 30A 2P | ||
| Load | Mini-split |
Notes on the sheet
- Four-wire feeder: neutral isolated and equipment ground bonded at the detached structure.
- Grounding electrode installed at the detached structure and connected to the equipment grounding bar.
- Burial depth per the adopted code for the wiring method used.
Diagram is schematic and not to scale. Field-verify existing equipment ratings. Ratings and conductor sizes shown are typical. Confirm against the adopted code, the equipment listing and a load calculation before installation. Code references are to the 2023 NEC and the 2024 Canadian Electrical Code: see references and editions.
Related service and panel drawings
Service and main panel upgrade to 200A
New meter socket, service entrance and 200A panel.
ServiceView drawingPanel upgrade with grounding system replacement
New panel with rods, water bond and intersystem bonding.
ServiceView drawingSubpanel addition
100A four-wire feeder to a new subpanel.
ServiceView drawing400A service with two 200A panels
Class 320 meter socket feeding two main panels.
ServiceView drawingSee all service and panel single line diagrams, or all 40 templates.
Start from this drawing
Free, in the browser, no account. Start from a template or describe the job in plain words, edit the drawing and export a PDF.